Grid connection


  • overhead line 110 kV Tomislavgrad-Rama (115 MVA capacity) passing through Pakline location

  • first phase (aprox. 100 MW) planned for connection through transformer station 30/110 kV

  • for second phase, possibility for connection to 110 kV lines Tomislavgrad-Livno/Kupres or 2x220 kV line Rama-Posusje